George Neujahr


  5303 Crystal Ct.
Wilmington, NC  28409
(910) 452-6328

RESUME



Summary:

Experience:

10/05 - Present      
Horace Cofer Associates (PCS) Ameren Corporation
Edwards Power Station - Illinois

Training Specialist
Developed system descriptions, exam banks, and lesson plans for operations training for a three unit Coal Fired Power Plant. Completed all work offsite through the use of web folders.
 
02/05 - 11/05      
Trump National Golf Course Bedminster
New Jersey

Professional Golf Associate
Professional golf associate at nationally ranked Top 100 private golf course. Provided training to professional golf caddies and assisted in actual player development.
 
10/04 - 12/04      
Commercial Construction
Florida

Commercial Trim Carpenter & Tile Setter Helper
Responsible for the complete internal and external remodeling of Longhorn Steakhouse located in Jensen Beach, Florida. Performed a multitude of tasks including complete demolition and rebuild of several walls and floors including installation new metal and wood studded walls, sheetrock, dura-rock, wonder boards, bead board panels, trim boards, FRP, membrane, quarry tile, ceramic tile, and concrete patching.
 
07/04 - 07/04      
Horace Cofer Associates (PCS) Ameren Corporation
Edwards Power Station - Illinois

Information Technology Specialist
Extended the Site Specific Plant Engineering Documentation for the power plant in an electronic format to FTP Server.
 
05/04 - 06/04      
Horace Cofer Associates (PCS) Ameren Corporation
Newton Power Plants - Illinois

Training Specialist
Performed system walk downs and technical reviews for all plant systems for operations training for a dual unit 600 MW Coal Fired Power Plant.
 
x4/04 - 05/04      
Horace Cofer Associates (PCS) Ameren Corporation
Duck Creek, Edwards, and Newton Power Stations - Illinois

Information Technology Specialist
Extended the Site Specific Plant Engineering Documentation for three different coal fired power plants in an electronic format to FTP Server for use over the internet by experts.
 
10/03 - 01/04      
Horace Cofer Associates (PCS) Ameren Corporation
Grand Tower Power Station - Illinois

Training Specialist
Developed system descriptions, exam banks, and lesson plans for operations training for a dual unit 400 MW Coal Fired Power Plant. Completed all work offsite through the use of FTP Servers and directed two other technical writers.
 
01/03 - 09/03      
Onsite Engineering Services Duke Energy North America
Moss Landing Power Plant - California

Unit 1 & 2 Alarm Response Graphic Procedure Project Foxboro I/A DCS Specialist
Developed and integrated over 1,000 alarm response graphic procedures within the Digital Control System to provide state of the art operator response capability to abnormal events for a dual unit 500 MW Combined Cycle Power Plant with Foxboro I/A DCS and Mark VI Turbine Controls. Each combined cycle unit consists of two GE Combustion Turbines (Frame 7) and two Heat Recovery Steam Generators supplying a GE Reheat Combined Cycle Steam Turbine with Cascade Bypass. Procedures were developed using Foxboro.s Fox Draw Software with all of them totally integrated inside the DCS Software for instantaneous access upon receipt of the alarm or as desired by the operator. Procedures only existed electronically but also included capabilities to be printed through the DCS by the operator for maintenance or training reasons. Project included initial adjustment of over 500 alarm set points inside the DCS based on final tuning parameters.
 
05/02 - 12/02      
Onsite Engineering Services Duke Energy North America
Moss Landing Power Plant - California

Unit 6 & 7 Alarm Response Graphic Procedure Project Foxboro I/A DCS Specialist
Developed and integrated over 2,000 alarm response graphic procedures within the Digital Control System to provide state of the art operator response capability to abnormal events for a dual unit 800 MW Super Critical Natural Gas Power Plant with Foxboro I/A DCS Controls. Project included readjustment of over 1,000 alarm set points inside the DCS based on final tuning parameters to eliminate nuisance alarms and revision of existing system display graphics to add missing digital and analogs parameters desired by the operators.
 
02/02 - 05/02      
Onsite Engineering Services Duke Energy North America
Moss Landing Power Plant - California

Unit 7 Controls Upgrade Retrofit Project Startup Turnover Package Coordinator
Served as Construction and Commissioning System Turnover Package Coordinator during Initial Gas Fire Startup and Provisional Acceptance Testing to 100% Power. Developed administration procedures, commissioning procedures, pre-operational tests, system descriptions, and standard test record forms for a single unit 800 MW Super Critical Natural Gas Power Plant with Foxboro I/A DCS Controls. Provided system turnover package coordination for all new systems including ID & FD Fans, NH3, SCR, 13.8 kV Electrical, TCV and PCV Hydraulic Power Units, and Foxboro I/A DCS Systems.
 
02/01 - 02/02      
Horace Cofer Associates (B & W) Kansas City Power & Light
Hawthorn Power Station - Missouri

Unit 5 Hawthorn Reconstruction Project Operations Specialist
Served as On-Shift Control Room Advisor during Initial Coal Fire Startup and Provisional Acceptance Testing to 100% Power. Developed commissioning procedures, final operating procedures, system descriptions, and training lesson plans for a 600 MW Combined Cycle (Coal and Gas) Power Plant with Bailey DCS Controls. Developed all GE Mark V Turbine Control System Test Procedures. Provided formal classroom instruction for 60 different operators on FW, FW Heaters, Condenser Vacuum, Main Turbine & Auxiliaries (LO, EHC, SS, ES, MS, and Mark V Turbine Control), ID & FD Fans, NH3, SCR, I&A, Coal Handling, and Boiler Control Systems.
 
11/96 - 02/01      
Residential & Commercial Construction Contractor
Southeastern North Carolina

Framing & Trim Carpenter
Built several dozen residential houses as framing and trim carpenter utilizing both wood and metal studs. Trim Carpenter for new construction on a Dillard's Department Store, Great Outdoor Provisional Company, and a Major Computer Office Metal Framed Complex.
 
01/96 - 10/96      
Carolina Power & Light, Brunswick Steam Electric Plant
North Carolina

Operations Power Up-Rate & ITS Project Lead
Developed the project scope and revised all operations procedure types to implement Improved Technical Specifications for a dual unit 800 MW GE BWR4 Power Plant. Resolved program issues, maintained staff schedules, and directed activities for 3 Technical Consultants.
 
01/95 - 01/96      
WD Associates Philadelphia Electric Company
Peach Bottom Power Station - Pennsylvania

Engineering Power Up-Rate & ITS Project Lead Reviewer
Developed several new surveillance tests to implement Improved Technical Specifications for a single unit 800 MW GE BWR4 Power Plant. Surveillance tests that were developed included the Reactor Protection System Logic System Functional, Battery Charger Capability, Primary and Secondary Containment Isolation Valves, 4 kV Bus Undervoltage and Diesel Generator Surveillance Tests.
 
04/94 - 08/94      
Primera Engineers Commonwealth Edison Company
Dresden Power Plant - Illinois

Operations ITS Project Technical Specialist
Reviewed and revised all operations procedure types to implement Improved Technical Specifications for a single unit 800 MW GE BWR4 Power Plant.
 
01/91 - 04/94      
Horace Cofer Associates Carolina Power & Light
Brunswick Steam Electric Plant - North Carolina

Reviewed and revised all operations procedure types for a dual unit 800 MW GE BWR4 Power Plant to support the day-to-day operation of the units. Reviewed plant modifications for impact on plant operations, resolved assigned department actions items, investigated and prepared reports on operating events, and coordinated operations activities associated with plant modifications during several outages. Developed several new abnormal operating procedure types including Loss of Power, Fuel Pool Cooling, Shutdown Cooling and Severe Weather.
NOTES
 
01/90 - 12/90      
Horace Cofer Associates Carolina Power & Light
Brunswick Steam Electric Plant - North Carolina

Operations Procedure Backlog Reduction Project Lead
Reviewed and revised all operations procedure types for a dual unit 800 MW GE BWR4 Power Plant to reduce the number of open procedure revision requests from over 800 to less than 25 and directed activities for 2 Technical Consultants.
 
02/89 - 12/89      
Horace Cofer Associates Carolina Power & Light
Brunswick Steam Electric Plant - North Carolina

Station Blackout Project Technical Specialist
Reviewed and revised all operations procedure types to implement Station Blackout Rule for a dual unit 800 MW GE BWR4 Power Plant. Reviewed site specific report, developed emergency bus load lists and electrical system abnormal operating procedures, and identified components to be added to preventative maintenance program.
 
11/87 - 01/89      
Action Technology Carolina Power & Light
Brunswick Steam Electric Plant - North Carolina

Maintenance Staff Engineer
Reviewed and revised all maintenance procedure types for a dual unit 800 MW GE BWR4 Power Plant to support the day-to-day operation of the units. Reviewed plant modifications for impact on plant maintenance, and resolved assigned department action items.
 
04/87 - 11/87      
Nuclear Energy Consultants Boston Edison Company
Pilgrim Power Station - Massachusetts

Post Maintenance Test Review Project Lead
Implemented a Post Maintenance Test Program for a single unit 800 MW GE BWR4 Power Plant. Reviewed maintenance work requests, developed required post maintenance tests, testing matrix, and directed activities for 3 Technical Specialists.
 
10/86 - 03/87      
Horace Cofer Associates (SAIC) Tennessee Valley Authority
Chattanooga Engineering Complex - Tennessee

ONP Procedure Standardization Project Technical Consultant
Developed administrative procedures and writer's guidelines for all TVA Power Plants. Reviewed Emergency Operating Procedures against the Plant Specific Technical Guidelines and Regulatory Requirements and provided recommendations to improve quality.
 
04/86 - 09/86      
Mechanical Equipment Corporation Northeast Utilities
Millstone Power Station - Connecticut

Technical Training INPO Accreditation Project I&C Instructor
Developed instrumentation and control training lesson plans to implement INPO Accreditation Technical Training Program for a Westinghouse 7300, Combustion Engineering, and GE BWR2 Power Plant. Provided classroom instruction for several weekly courses including feed water.
 
11/85 - 11/85      
Horace Cofer Associates NRC
Region I Headquarters - New York

NRC Surveillance Program Inspector
Audited Northeast Utilities Millstone Power Station Unit 3 Surveillance Program for authorization of Operating License.
 
03/85 - 03/86      
Horace Cofer Associates (SAIC) Tennessee Valley Authority
Browns Ferry Plant - Alabama

Procedure Upgrade Project Lead
Developed administrative procedures, writer's guidelines, first draft site instructions, and final site instructions for a triple unit 1100 MW GE BWR5 Power Plant. Resolved program issues, maintained staff schedules, and directed activities for up to 33 Technical Specialists.
 
02/84 - 03/85      
General Electric Carolina Power & Light
Brunswick Steam Electric Plant - North Carolina

Maintenance Surveillance Test Upgrade Project Lead
Developed project scope, writer's guidelines, pilot surveillance procedures, and final surveillance procedures for a Dual Unit 800 MW GE BWR4 Power Plant. Resolved program issues, maintained staff schedules, and directed activities for up to 15 Technical Specialists. Provided on the job training to instrument control technicians for performance of weekly, monthly, and refueling outage tests. Surveillance tests that were developed included all Reactor Protection System and Primary Containment Isolation System Channel Functional and Calibration Tests.
 
08/82 - 01/84      
NUS Training Corporation Carolina Power & Light
Brunswick Steam Electric Plant - North Carolina

Operations Procedure Upgrade Project Technical Specialist
Developed project scope, writer's guidelines, pilot operating procedures, and final operating procedures for a dual unit 800 MW GE BWR4 Power Plant. System operating procedures that were developed included the Nuclear Boiler, SLC, SBGT, CRD, RHR, RCIC, HPCI, CS, ADS, CAC, CAD, Main Steam, and DC Distribution Systems.
 
02/82 - 07/82      
NUS Training Corporation Arizona Public Service
Palo Verde Generating Station - Arizona

Training Article Development Project Training Specialist
Developed training articles and lesson plans for operations training for a triple unit 1100 MW Combustion Engineering 80 Power Plant.
 
08/81 - 01/82      
NUS Training Corporation Carolina Power & Light
Brunswick Steam Electric Plant - North Carolina

System Description Development Project Training Specialist
Developed system descriptions for operations training for a dual unit 800 MW GE BWR4 Power Plant.
 
07/74 - 06/81      
United States Navy U.S.S. New York City SSN 696
Atlantic & Pacific Fleet

Reactor Controls Division Lead 1st Class Petty Officer
Directed activities for 7 Instrument Control Technicians. Received 3 Commendations and a Good Conduct Award during tour of duty and was considered one of the two best Reactor Operators in the Pacific Fleet at the time of my separation.
 



View in PDFView this document in PDF format